Network Infrastructure
IT Infrastructure Planning
Site surveys, capacity planning and infrastructure design documents.
Overview
Decide on paper, before money is spent on site.
Most IT infrastructure problems are planning problems: too few points, a server room with no cooling, a rack in the wrong place, conduits nobody left space for. Fixing them after the interiors are finished costs many times more than getting the plan right.
We survey the site, study what the business needs today and in five years, and produce a design and bill of quantities you can budget against, tender or build in phases.
Scope of work
What's included
- On-site survey and requirement study
- Network architecture and capacity design
- BOQ preparation with brand options
- Phased rollout planning for live facilities
Every IT infrastructure planning engagement follows our documented delivery process and is handed over with as-built documentation. It also qualifies for our annual maintenance program.
Delivered from our offices in Mumbai, Pune, Kolhapur and Ichalkaranji.
How we deliver it
- 01
Survey and requirement study
We walk the site or study the drawings, count users and devices, and understand the applications the network must carry.
- 02
Design
Network architecture, rack and server room locations, cabling routes, WiFi and CCTV positions, and the power and cooling they need.
- 03
Bill of quantities
A line-by-line BOQ with brand options at different price points, so quotes can be compared like for like.
- 04
Phasing
A rollout plan that fits the construction stages, or keeps a working facility running while it is upgraded.
Buyer's checklist
What a good IT infrastructure plan includes
- Drawings that show every data point, rack, access point and camera
- Space, power and cooling for the server room, agreed with the architect
- Capacity for growth: spare points, rack space and conduit
- A BOQ specific enough to compare vendor quotes line by line
- A phased schedule aligned with the interior and electrical work
Related services
Industries we deliver this for
Talk to an engineer about IT infrastructure planning
FAQs
IT Infrastructure Planning: common questions
When should IT planning start in a new office or building project?
At the design stage, alongside the electrical and interior drawings. Conduits, rack rooms, power and cooling are cheap to provide before construction and expensive to add afterwards.
Can you prepare a BOQ we can use for tendering?
Yes. We prepare a detailed BOQ with specifications and brand options, and can support the technical evaluation of the bids that come back.
Can you plan an upgrade for a facility that is already running?
Yes. We design the upgrade in phases and schedule the work in maintenance windows, so the existing network keeps running until each new section has been tested.